The plant knew how many parts came out each day, but not why they were rejected or where. Now it sees it as it happens.

The challenge

15% rejection rate with no idea which shift, machine or product it came from

The solution

Line data capture, shared quality metrics and a shop-floor screen with visual thresholds

How we did it

We connected the line data capture and the quality control records, which until then were written on paper and typed up once a week. From there we defined the quality metrics once and for all: rejects by shift, by machine and by product reference, with the same calculation rule for everyone. The shop-floor screen shows the state of each line with visual thresholds, so a deviation is visible from the other end of the workshop without reading a single number. Supervisors get the shift detail as it closes, and the quality team works with the history to see which references concentrate the problem. The project includes no predictive component: the improvement comes from seeing deviations in time and working from the same figure.

Results

−80%
Issue detection time
−34%
Rejects over six months
1
Quality report for the whole plant

Project timeline

  1. Map of line and quality control records

  2. Quality metric dictionary

  3. Shop-floor screen with visual thresholds

  4. Shift report for supervisors

Testimonial

“The numbers were always there, but nobody looked at them until Monday. Putting the screen on the shop-floor wall instead of in an office was their proposal, and it was the right one.”

Jordi M.

Quality director

We analyze your case

Describe your current situation and your goals. We reply within 24 hours with a first assessment.